Elevating Your Audio, Video & Lighting Experience
Estimates Included: MC-AudioControl | MC-VideoBest | MC-Lights | MC-House Lighting | MC-AcstTreatm | MC-DistrAudio
Estimate Date: 06/18/2026
Prepared for: Pastor Chad Overton — Fort Worth, TX
This estimate covers a complete Audio, Video & Lighting infrastructure upgrade for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton.
The scope includes a full stage lighting and house lighting packages Featuring Chauvet Pro, and HOG 5 lighting control, a broadcast video system featuring the latest Blackmagic Design Broadcast Quality Cameras and Video Processing, and common area distributed video.
Additionally, a redesign of audio control systems featuring Allen & Heath, Shure ULXD and RF Venue for excellent RF and audio control while still providing access to 3rd party house mixing infrastructure. Additional allowance for EAW PA expansion including fills and delays as determined by final architectural plans.
The combined total across all eight estimates is $510,173.00.
Full AVL Scope
Combined Estimate Total
The following eight estimates cover the complete Audio, Video & Lighting scope for Mission City Church in Fort Worth, TX. Each estimate represents a distinct system category, all prepared by 360 AVL Design on 06/18/2026.
Qty: Multiple items
360 AVL Design Price: $62,788.00
Qty: Multiple items
360 AVL Design Price: $50,513.00
Qty: Multiple items
360 AVL Design Price: $117,314.00
Qty: Multiple items
360 AVL Design Price: $67,444.00
Qty: Multiple items
360 AVL Design Price: $23,755.00
Qty: Multiple items
360 AVL Design Price: $23,813.00
Qty: Multiple items
360 AVL Design Price: $95,641.00
Qty: Multiple items
360 AVL Design Price: $68,905.00
The Mission City Church full AVL installation is a multi-phase project covering audio, video, and lighting systems across the sanctuary, broadcast room, lobby, and stage areas in Fort Worth, TX.
Coordinate with the church, architect, and project managers to confirm routing, rigging, electrical, and finalize product selections.
Install the key lighting truss and pipe grid, as well as all overhead rigging involving lift work and aerial access.
Complete the lighting, audio, and video infrastructure, pulling all cable and landing racks.
Install low-voltage cabling for the House Pendant fixtures, RDM controller, as well as all stage lighting.
Install all audio control systems, RF devices, and additional PA. Add new audio cabling, floor pockets, patch plates, and complete installation of acoustic panels.
Install the Blackmagic video control devices and all cameras. Build out the broadcast suite with the video rack and studio desk.
Implement all distributed video screens.
Program all consoles and equipment, optimize audio tuning and frequency coordination, and provide a final walkthrough and training for the Mission City Church team.
The following is the complete combined estimate for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton. Estimates MC-AudioControl, MC-VideoBest, MC-Lights, MC-House Lighting, MC-AcstTreatm, MC-DistrAudio, MC-LEDabsen7x7, and MC-KidsAVL. All pricing reflects 360 AVL Design rates. Combined total: $510,173.00.
Combined Estimates — Mission City Church

Mission City Church — AVL System Layout
Complete audio control infrastructure for Mission City Church in Fort Worth, TX
Estimate No.: MC-AudioControl | Estimate Date: 06/18/2026
48-Channel Digital Mixer — $6,895.00
Digital Snake — $3,899.00
ULXD Quad Receiver — $5,252.00
Antenna Combiner — $620.00
Power Sequencing — $2,080.00
Complete stage lighting infrastructure for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton by 360 AVL Design. Estimate No.: MC-Lights | Estimate Date: 06/18/2026
Moving Head Spot (x6) — $18,300.00
RGBW Moving Head (x10) — $18,750.00
LED Engine (x16) — $24,480.00
Fresnel Key Light (x4) — $6,396.00
All in One Touchscreen PC — $6,165.00
Hazer (x2) — $1,590.00
Complete house lighting infrastructure for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton by 360 AVL Design. Estimate No.: MC-House Lighting | Estimate Date: 06/18/2026
Mission City Church — House Lighting Layout Plan
Complete video production infrastructure for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton by 360 AVL Design. Estimate No.: MC-VideoBest | Estimate Date: 06/18/2026
Complete acoustic treatment package for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton by 360 AVL Design. Estimate No. MC-AcstTreatm, dated 06/18/2026.
Standard Fabric — 24 First Floor panels, 8 Balcony Panels, 4 Broadcast Studio
Qty: 36 @ $440.00 each
360 AVL Design Price: $15,840.00
Standard Fabric — 8 Face of Balcony Panels
Qty: 8 @ $275.00 each
360 AVL Design Price: $2,200.00
Qty: 44 hours @ $90.00/hr
360 AVL Design Price: $3,960.00
Oversize skid — Turck Delivery
Qty: 1 @ $1,755.00
360 AVL Design Price: $1,755.00
Total: $23,755.00
Complete distributed audio package for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton by 360 AVL Design. Estimate No. MC-DistrAudio, dated 06/18/2026.
Subtotal: $5,285.00
Subtotal: $11,013.00
Cat6 Control Cable + Speaker Cabling
Qty: 1 @ $1,365.00
Installation, Programming, Cabling & Cable Management
Qty: 1 @ $6,150.00
Total: $23,813.00
Complete LED video wall package for Mission City Church in Fort Worth, TX — prepared for Pastor Chad Overton by 360 AVL Design. Estimate No.: MC-LEDabsen7x7 | Estimate Date: 06/18/2026
13'×21' LED Wall — 49 Cabinets ($37,485.00)
Video Processor — $3,820.00
Installation & Programming — $12,950.00
Product Discount — −$40,200.00
Complete Audio, Video & Lighting Package
This estimate covers a complete, purpose-built AVL system for the Mission City Church Kids Ministry space — designed to deliver an engaging, high-energy worship experience for children. The system integrates a professional audio package with digital mixing and wireless microphones featuring Allen & Heath, Shure, & JBL SRX. Also, a Tier 3 LED video wall with media playback, and a full stage lighting rig with moving heads and wash fixtures — all controlled through intuitive, easy-to-operate interfaces. A $7,000 discount has been applied to the labor, bringing the total from $79,697 to $72,697.
Estimate No.: MC-KidsAVL | Estimate Date: 06/18/2026
All Installation — Video, Audio, Lighting, Programming & Cabling — $21,000.00
Applied to Labor — Total reduced from $79,697 to $72,697
Questions about this estimate? Contact Jeremy at 360 AVL Design to discuss payment or project details for Mission City Church.
We appreciate the opportunity to provide you this proposal and the chance of standing with you in vision and in ministry!
Estimates MC-AudioControl | MC-VideoBest | MC-Lights | MC-House Lighting | MC-AcstTreatm | MC-DistrAudio — Mission City Church — 06/18/2026
This proposal is presented to Mission City Church as "first look" pricing structure with full customization options available and expected with next steps and future revisions based on collaborative efforts between church staff, architect and GC. 360AVL does not charge for revisions or changes to the AVL Design. Pricing within this estimate is current base upon market pricing as of 6/18/2026, and is subject to change with any manufacturer pricing updates outside of our control.